Tuam Tshoj High Performance Txhaj Tshuaj Molding Tshuab Chaw muag khoom

Blog

» Blog

Yuav ua li cas khiav ntsug thiab kab rov tav txhaj tshuaj molding tshuab

Lub Ob Hlis 18, 2021

Raws li kev npaj ntawm kev txhaj tshuaj thiab cov cuab yeej clamping, txhaj tshuaj molding tshuab tuaj yeem muab faib ua ntsug txhaj tshuaj molding tshuab, kab rov tav txhaj tshuaj molding tshuab thiab ntsug kab rov tav compound txhaj tshuaj molding tshuab. Hnub no, Kuv yuav piav qhia txog kev ua haujlwm ntawm ob tus qauv uas tau hais los saum toj no, yog, kab rov tav txhaj tshuaj molding tshuab thiab ntsug txhaj tshuaj molding tshuab

Vertical txhaj tshuaj molding tshuab yog cov cuab yeej siv tshuab. Nws feem ntau yog tsim los ntawm kev txhaj tshuaj, clamping system, hydraulic kis system, hluav taws xob tswj qhov system, lubrication system, cua sov thiab cua txias system, kev saib xyuas kev nyab xeeb, lwm yam.
Txhaj tshuaj system yog ib qho ntawm qhov tseem ceeb tshaj plaws ntawm kev txhaj tshuaj molding tshuab, feem ntau muaj peb yam tseem ceeb: TEJ TOM HOM, Ntsia Hlau Hom, ntsia hlau pre yas plunger txhaj hom. Tam sim no, feem ntau siv yog ntsia hlau hom. Nws txoj haujlwm yog tias nyob rau hauv lub voj voog ntawm kev txhaj tshuaj molding tshuab, ib qho nyiaj ntawm cov yas tuaj yeem ua kom sov thiab muab yas rau hauv lub sijhawm teev tseg, thiab tom qab ntawd cov yas molten tuaj yeem raug txhaj rau hauv pwm kab noj hniav los ntawm cov ntsia hlau nyob rau hauv ib qho kev siab thiab ceev.

Kab rov tav txhaj tshuaj molding tshuab: Qhov no yog hom ntau tshaj plaws. Cov pwm kaw qhov thiab qhov txhaj tshuaj yog nyob rau tib kab kab nruab nrab, and the mold is opened along the horizontal direction. Its features are: low fuselage, easy to operate and maintain; low center of gravity of the machine, stable installation; products can be automatically dropped by gravity after ejection, easy to realize full-automatic operation. Qhov tsis zoo yog: the installation of the die is troublesome, the insert has been published, if the die has the possibility of tilting or falling down, the machine occupies a large area. This type of injection molding machine is widely used in the market

How To Operate Vertical injection molding machine

pre-start preparation, check the lubrication part is fully lubricated. Check the pump for abnormal noise. Carefully install the fastening die, pay attention to the upper and lower die to ensure safety, adjust the pressure of each section, set the temperature of each section

Manual operation and Adjustment Manual operation to adjust the position of the switch, and to ensure the safety of the die. The Electronic Control Panel manual button set to ON (qhib) , the machine manual operation, the electronic control panel ON the action button only when the button to press (ON) can have action, release when the action disappeared. Sentence is too long, please supply a shorter sentence. Produce A high-voltage mode-lock when touching a switch block for high-voltage access to a model. Block: Adjust the mold alignment mold when used, that is to control the use of fuel nozzle cylinder table forward. INJECTION: according to the material, shape and size of the product, adjust the injection pressure, keep the injection time and position, press the injection button to make the injection. (Nco tseg: Do not feed until the temperature reaches the set point) screw feed: Press the feed button, the screw rotation material is stirred mixing compression screw is thus raised (the speed of rise is determined by the back pressure control valve adjustment) , when the screw rise to touch the feed close to the switch block, feeding action stopped, feeding stroke size depends on the amount of injection glue required. UNPLUG: 1) shoot off when the unplug button is pressed and the screw moves up. 2) when half-started, the loosening action is mainly to pull the screw up a distance (the distance is determined by the loosening time) after the automatic feeding. The purpose of this action is to prevent the rubber from expanding due to the compression and thermal shrinkage of the feeding material from spilling out at the opening of the feeding barrel (the funnel) , blocking the pouring channel of the mould and preventing the rubber from being injected into the feeding hole again. EJECTION: press the top ; button, the product is ejected, semi-automatic time before and after the ejection can be adjusted to determine the ejection height. PUSH BACK: press the push down button, the thimble is automatically back to the original position, do automatically when the top retreat time can be adjusted to determine the stop time thimble. Thimble Count: semi-automatic setting thimble count to determine the number of ejector count. Seki: turn off the switch on the control panel, and always clean the supplies on your machine.

 

How To Operate Horizontal injection molding machine

start to check the power before opening the power first check the power cord, confirm whether the hydraulic oil is sufficient and check the safety door close switch is out of order, safety door switch is smooth. To install the mold, you must manually close the safety door with the fixed circle on the fixed plate, switch the mold to install the mold adjustment, carry out the Seki Mold. Adjust the mold to make the center of the shooting mouth up and down, right and left, and then fix the mold on the fixing plate. Adjust thimble stroke and speed, thimble stroke overruns may damage the mold. So in the beginning, you have to make it shorter. Adjusting a security device for a visa card. Adjusting a security device for a visa card.

Molding operation, manual operation will select the operation switch switch switch to the manual position, and then press the pump start button. The safety door on the left side of the drill must also be closed. Switch the mold to switch to Seki Mode , then the Seki mode action starts, and the high voltage completes. EJECTOR switch to forward , nozzle contact complete. Cov cuab yeej txhaj tshuaj switch switch to injection , then the injection action, pressure from the injection (a) pressure into the secondary pressure. Nco tseg: start the screw drive motor 15 minutes after the temperature of the heating cylinder reaches the set temperature to avoid damage to the screw. Measure the holding time of pressure. Switch the screw to switch to the rotation position, the measurement. The ejector switch is switched to reverse the ejector to the proper position. Tom qab ntsuas lub sijhawm txias, hloov pwm mus rau hom qhib . Nias lub thawb tawm mus ntsuas qhov thawb tawm ntawm cov khoom tiav.

Molding operation, tsis siv neeg ua haujlwm ua ntej los ntawm kev tuav haujlwm, kom molding tej yam kev mob ruaj khov, ces cia li mus rau hauv molding lag luam. Ua ntej nkag mus rau kev ua haujlwm tsis siv neeg, teem sijhawm txhua lub sijhawm, rau kev ua haujlwm tsis siv neeg molding, kev ua haujlwm ntawm kev xaiv hloov yuav raug hloov mus rau semi-automatic kom paub meej txog kev nyab xeeb nyob ib puag ncig, lub qhov rooj ruaj ntseg kaw. Thaum lub pwm tig tawm, nws hloov los ntawm cov qauv hluav taws xob qis mus rau cov qauv hluav taws xob siab ntawm kev mus rau Sekiya. Lub tog kaw siab nce siab tom qab kev pom zoo, tua lub cuab yeej rau pem hauv ntej. Tom qab kev sib cuag nozzle tiav, txhaj tshuaj pib. Thaum lub sij hawm txhaj tshuaj yog suav, txhaj tshuaj thiab tuav tuav yog nqa tawm. As soon as the injection timer reached its set time, the cooling and metering of the injection began. The screw rotates while backing away. Once the projectile is out of contact with the on-off switch, the thrust mechanism retracts. When the cooling time timer reaches the time, the pressure in the closed die cylinder will drop and the die will be opened. When a close switch contact is stopped, the open-mode action stops. Then carry out the ejection action, this time the finished product by the thimble ejection, fall to the finished product fall on the board. When off-board is used, it can be detected and the next cycle begins. In the operation of machinery, to emergency stop, immediately under the operating disk or anti-operating disk side of them after the emergency stop. .

Thaum nres lub tshuab los ntawm kev tsim cov resin uas tuaj yeem yooj yim undergo thermal decomposition, thawj zaug nres muab cov khoom thiab txhaj tag nrho cov resin rau hauv lub tog raj kheej txhaj tshuaj kom tsis txhob muaj cov resin seem hauv lub tog raj kheej txhaj tshuaj thiab ua rau thermal decomposition.. Nyob rau ntawm no hauv kev ua haujlwm pwm tom ntej, resin lub tog raj kheej kub yuav tsum tau ceev faj, vim tej zaum MELTON resin yuav tawg. Thov tua lub tshuab hluav taws xob thiab ntxuav lub tshuab thaum ua haujlwm dhau los thiab txoj haujlwm raug tso tseg kom muaj kev nyab xeeb thiab tiv thaiv cov khoom siv hluav taws xob.

CATEGORY THIAB TAGS:
Blog

Tej zaum koj kuj nyiam thiab

  • Cov khoom tshwj xeeb

    Kev kub ceev txhaj tshuaj molding tshuab
    PET txhaj tshuaj molding tshuab
    PVC txhaj tshuaj molding tshuab
    Ob chav xim txhaj tshuaj molding tshuab

  • Tiv tauj peb

    Txawb:+86.18368497929
    Wechat: +86.18368497929
    Whatsapp: +86.18368497929
    Web:www.yongjiangimm.com
    E-mail:yongjiangimm@gmail.com

  • Kev pabcuam
    Yongjiang koj tus neeg muag khoom txhim khu kev qha! Luam theej duab nws, Tham kom zoo dua